Pump Supplies mobilised more than 30 12” submersible drainage pumps together with over 2km of pipework, valves, control panel and generators to support the Environment Agency in responding to the extreme flooding experienced in South Yorkshire.
Pump Supplies Engineers worked tirelessly around the clock with Engineers from the EA over a ten day period to position and reposition pumps and equipment to reduce the impact of flooding and redirect flows.