by Andrew John | Feb 2, 2023 | Case Study
Working with a leading Filter technology company, Pump Supplies have developed a high flow submersible filter pump incorporating the best in available filter technology and the best in electric submersible pump technology. This unique and innovative design promotes...
by Andrew John | Jan 17, 2023 | Case Study
During the weekend of January 14th, the team at Pump Supplies installed a considerable number of electric submersible pumps in several locations, totalling more than 770kw together with over 1 kilometre of 12” pipework and control equipment all being powered off 3...
by Andrew John | Apr 29, 2022 | Blog, Case Study
Troubled bridge over water – the repair and refurbishment of a dilapidated steel pipe bridge crossing the Rhonda River Sylmasta and Pump Supplies repair and refurbish a dilapidated 20-metre long pipe bridge crossing the Rhonda River in Porth, South Wales, helping to...
by Andrew John | Feb 28, 2020 | Blog, Case Study
Following on from the atrocious weather brought to the UK by storm Ciara, the Somerset Levels have suffered yet more serious flooding in February as storm Dennis blew in. Many roads were flooded, hundreds of homes were without power and trains were delayed and...
by Andrew John | Jan 3, 2020 | Blog, Case Study
Working with the Environmental Agency we reduced the level of water on Currymoor by 20%, that’s 5 million tons of water. We then moved the temporary pump intakes out into the deeper water so they continue to operate at maximum efficiency. We’ve reduced the level of...
by Andrew John | Nov 25, 2019 | Case Study
Pump Supplies mobilised more than 30 12” submersible drainage pumps together with over 2km of pipework, valves, control panel and generators to support the Environment Agency in responding to the extreme flooding experienced in South Yorkshire. Pump Supplies Engineers...