by Andrew John | Apr 29, 2022 | Blog, Case Study
Troubled bridge over water – the repair and refurbishment of a dilapidated steel pipe bridge crossing the Rhonda River Sylmasta and Pump Supplies repair and refurbish a dilapidated 20-metre long pipe bridge crossing the Rhonda River in Porth, South Wales, helping to...