by Andrew John | Nov 19, 2019 | Case Study
Back by popular demand, the Flygt 2151 pump is available exclusively from Pump Supplies and stocked in each of our depots available for immediate despatch. Already a popular model in the Pump Supplies hire fleet, the 2151 pump was bought back into production after...
by Andrew John | Nov 18, 2019 | Case Study
Saving Toddbrook Reservoir Dam from Collapse and Flooding Whaley Bridge! With a disaster imminent, hundreds raced, intent on saving Toddbrook Reservoir Dam from collapse and flooding Whaley Bridge, including engineers, the armed forces, Police, Fire Service, Canal...
by Andrew John | Nov 15, 2019 | Case Study
Quarries are prone to nuisance water which must be manged to maintain productivity. When Aggregate Industries decided to expand one of their quarries, a new dewatering system was required to manage the increased flow of water and to ensure daily operations were...
by Andrew John | Nov 15, 2019 | Case Study
Netheridge is Gloucester’s main sewage treatment works is served by over 30 outstations and treats the effluent of the whole of Gloucester, a population equivalent of 50,000 – 200,000. Situated next to the River Severn, Netheridge STW is a large urban site...
by Andrew John | Nov 15, 2019 | Case Study
During construction of the Rugby Western relief road a temporary pipework solution was required to divert a critical 600m diameter foul rising sewer running underneath Parkfield Road, allowing construction of an interconnecting tunnel built between two disused...
by Andrew John | Nov 15, 2019 | Case Study
Llangollen Canal is a popular boating branch of the Shropshire Union Canal which is fed from the river Dee. In two places, Chirk and Whitehouse, the canal travels underground through a long tunnel before approaching the network’s greatest feat of engineering,...